
Here are a few pictures:
Above: Living room, as it was, then carpets removed then fire removed and rubbish everywhere.
Below: Dining Room, before and after (this wall with the window and door is being knocked out next week)
In the hall behind the front door: I really love it, it has the meters in but in the little gap im going to put some little trinkets and hopefully get a floor length mirror to the left.
Bathroom:
Bedroom 2:
Bedroom 1: (and rotten step from the stairs that we are going to fix)
Bedroom 3: my dressing room
There is so much to do but thankfully i don't think it will take mega long ( we've been told about a month) so yeh I really cant wait to start decorating.
Post Comment
Post a Comment